Afore#

Configuring an Afore inverter with GbbOptimizer. GbbOptimizer controls the Afore inverter via the Modbus protocol.

GbbOptimizer mode mapping to Afore settings#

OperationRegisterValueAfter completion
AC charging maximum SOCCharging: target MaxSOC
ACCharging start/end time (1-4)Charging: array of next 4 periods
Forced charging start/end time (1-4)Charging: array of next 4 periods
ACCharging power percentageCharging: Input Limit% of MaxBuyPower or MaxBatteryChargeDCRestore original value
Forced charging power percentageCharging: Charge Limit% of MaxBatteryChargeDCRestore original value
Minimum SOC for forced dischargeDischarge: target MinSOC
Forced discharge start time (1-4)Discharge: array of next 4 periods
Power grid power limit percentageDischarge: GridSetpoint% of MaxSellPower or MaxBatteryDischargeDC
Maximum charging currentCharge block: sets 0Restore original value

Checklist#

  • Timing DChg ON/OFF = Enable
  • PDisChgMax (Forced discharge power percentage) = 100%